Wednesday, May 30, 2012

5 Hard Lessons From The Solar Market Of Greece

5 Hard Lessons From The Solar Market Of Greece
The development of solar power systems in Greece started in 2007 followers the energy policy law of 2006 for the association of renewable energy systems. Cosmological incentives were given together with the FiT wile (the energy shaped from solar power systems that are central to the grid is purchased at a knotted allude to of EUR/kWh).The FiT wile gave a enlarge to the solar sector in Greece and the results are accessible to the followers graphs: Fig 1. MWs of installed solar power per project type Fig 2. The development of Greek solar market (installed solar power in MWs)From January work September 2013, the new installed power of solar systems was 987,2 MW and the fancied just now installed power motion butte to 1092 MW work the end of the day. The whole installed solar power was, at September 2013, at 2523,5 MW. As has in the past been reported, Greece defenses 5thin the whole solar power per capita rankings in 2012, with supplementary than 142 MW installed solar power per million band. In the new solar power per capita rankings, Greece defenses 3rd in 2012, with 84.7 MW per million band. But what happened to Greece 's solar surge? Starting place, we speculative some gel coaching together with our experience:1) FIT AND Reorganization OF Bequest Trial, Be a devotee of IN TOO High INCENTIVES.In Greece, the reshuffle of go by events was not completely an quandary to constructively solar development but furthermore ended the solar incentives too water down, in the function of since the projects were at last authorised, the attach importance to of solar power systems had abbreviated at a major tome. To be message, the FiT was adoringly water down from the lead. Resultant the preparatory reduction in FiT from Respected 2012, promote cuts were introduced in May 2013 for solar power systems of all levels. The reduction in FiT reached near 50% of the preparatory apply, devastating the merchant banker 's solid in solar power systems. In this way, the market clap was followed by a quick-witted bump. So, prematurely applying a FiT wile, you requirement persuade that the FiT is courageous for the economy and that they are reorganized unendingly. FiT schemes requirement be regarded as transitional policies that for a split second enlarge solar power grow but are in the end substituted by supplementary likely schemes (net metering etc.). The FiT has to be slow by despoil participating in account not completely preparatory attach importance to of investment but furthermore the source of funding and the risks for the economy. 2) Uplift... BUT NOT TOO MUCH! Supreme of the band in Greece fear of solar power investments as the goose that may possibly lay the fair-haired produce. All, and I middle ALL, required to invest. As of all required to invest, and the state clear a huge paycheck to the investors, the banks required to fund. So many projects were implemented based on loans from the banks. But the state may possibly not shore up the too water down FiT for this countless of producers. Delays in the producers invoices secure the release of for the string 7 months plaguethe market and jeopardise the viability of companies that transfer on loan payment. The amount overdue of the Running of the Electricity Scaling-down in Greece has risen to 1 billion euros. In complement to all these, break up deductions of 30% transfer been viable to solar energy producers.Self may possibly wrestle that these tribulations are the prudence of the widely held economic tricky. Assured, the economic tricky helped in bringing to the beauty mistakes and incorrect judgements. In many personal belongings, the appropriateness of solar investments was not slow by later than all the risks in the function of investors and the banks relied on solar energy lead agreements. Additionally, the shortage of charge in solar system maintain and effects evaluation resulted in low energy yields, water down custody and release charge. 3) Service Consequence SYSTEMS ARE NOT THE Solo (AND Supreme Hands-on) WAY OF Cosmological Constrain Amalgamation. The peak rudimentary view of solar in Greece, is that solar power production coincides with premier demand. This fact reduces the need for demand retort applications or storage for compel shifting goal that the grid association attach importance to for solar power systems is degrade in Greece than other (noticeably northern) European countries. This furthermore course of action that if you install solar panels on the roof of your home, business or workshop, it is supplementary estimated that the energy shaped by the solar system motion be not here by your compel, avoiding at the same characterize sufferers due to the scattering of solar energy. So, you can utilise solar energy in your facility and buy energy from the grid since solar power is not ample or install some sort of storage. The requests for storage are degrade in Greece than other countries, as acceptable as the need for centralised deputy capacity. So in Greece, off grid systems and on point deployment schemes may possibly be supplementary efficient than in other countries. Also, small verbose solar power systems citizen the ability of investors and banks. And...they are supplementary likely.Don't you devise that this agree requirement transfer been exploited?4) Cosmological Solitary, WON'T Uplift THE Parsimony.For instance the solar incentives were firm in Greece (2006-2007), the arrange sector was in idle. Several professionals and companies from arrange, started private the solar industry in enlighten to begin from the development that was foreseen, what in attendance were not any firm stipulation desires for the contractor of solar power systems. This fact restricted the agree for specialist band to be leaders of the solar grow and, in some face, resulted in wasteful systems with low energy wages. I evocatively cargo space that the development of principal parallel business sectors that are in idle has to be premeditated since boosting solar, but in a likely way. For example, in attendance may possibly be desires for the collect or background of the companies that take the development of solar projects. Synergy has to be supported. Architects, electrical engineers, installers, constructions companies and universities requirement reduce cool to retail alternative ways of solar power association participating in principal and new structures. 5) Address Creation OF Cosmological Stuff IS THE KEY TO Desire Detention Tumor.In Greece we transfer a wise saying - it's sort of an urging to pubertal men and women: "Buy a shoe from your site of downward gradient, loyal if it's mended" (shocking for the plain kind, I did my best!). Sound, incentives and shore up of domestic production is a noticeably rudimentary designate of stingy grow. In spite of the wise saying, since it came to solar systems, Greeks preferred to soubriquet effects from Germany and China. Assured, many new companies came to Greece to place undergrowth and many Greek band had the game to reduce in attendance. But completely for a thick nickname. Now that the market is declining, new companies go back, leaving all public band are without a job. The truth is, that the state did not shore up the organization of domestic production services and research organisations that would create jobs and diagnosis for promote development and exploitation (exports etc.). The 6-year collect of Greece in solar power, is restricted to the buttress of EPC armed forces. That is an exceed that we missed.I impediment for your explanation and solar experiences!Awareness politeness of domdeen / FreeDigitalPhotos.net

0 comments:

Post a Comment